Connect with us at Construction Intel Summit KSA on 23 Nov 2022 | Live | Riyadh

JMC Bridge: A 1200 Metre Marine Bridge Over Narmada River in Jabalpur

Infrastructural

Highlights

Scale

1200 Metre

Client

DBL

Status

Completed

Overview

A 1200 m Marine bridge over the Narmada River, Techture worked with the contractor to develop a BIM implementation workflow and gave way to better management and cost reconciliations through the BIM model. Techture converted the designs into a custom information-rich BIM components, made the construction schedule, extract the quantities and generated 5D simulation for the project.

Deliverables

  • Infrastructural BIM Modelling
  • Structural BIM Modelling
  • MEP BIM Modelling
  • Construction Scheduling and Project Tracking
  • 5D BIM Simulation
  • Clash Detection
  • Photorealistic Rendering
  • Video Walkthrough

Testimonials

quote-icon

The attention to detail and quality of the architectural model that Techture does is really very good. We like to work with companies who have a high focus on delivering good quality and that is where Techture is always on point.