55-level skyline in Toronto featuring a 5 basement levels for parking, a ground level through to the 2nd level filled with a lobby and various amenities, and from the 3rd floor upwards, it houses a collection of suites for residents.
1. Develop LOD 400 Architecture, Structure, MEPF and Landscape Model.
2. Clash Detection, constructibilty review, coordination between all the stakeholders throughout construction stage.
3. Identify issues in IFC Drawings.
4. Model Collaboration on BIM 360 and Issue Management via Revizto.
Connect with us to Streamline your construction process, reduce costs, and improve project efficiency with our expert-driven BIM & VDC solutions. To ensure seamless coordination, minimizing errors and delays, we help you to optimize workflows and maximize project success.