Connect with us at Construction Intel Summit KSA on 23 Nov 2022 | Live | Riyadh

Delhi Metro Phase 4: Completed Infrastructural Project with 10 Stations

Infrastructural

Highlights

Scale

10 Stations and 12.5 Km of viaduct

Client

Confidential

Status

Completed

Location

Delhi, India

Overview

The Delhi Metro’s Phase 4 (Phase IV), has been planned to provide last-mile connectivity to the new housing hubs in the National Capital Region (NCR) in which Techture has been provided the works of complete BIM modelling, 4D/5D simulation for DC-01 Contract. Techture has also deployed a BIM coordinator on-site for better communication and execution of the project.

Deliverables

  • LOD 300 Model Generation
  • Clash Detection and Coordination
  • Execution and Creation of LOD 400 BIM Model
  • Quantity Estimation
  • Generation of Coordinated Drawings
  • As-Built Model
  • Planned 4D Simulation
  • On-site BIM Coordinator deployment

Testimonials

quote-icon

The attention to detail and quality of the architectural model that Techture does is really very good. We like to work with companies who have a high focus on delivering good quality and that is where Techture is always on point.