Al Maktoum Airport: 4D, Sequencing, Logistics | Completed in Dubai

Infrastructural

Project Highlights

Scale

1.6 Million sq ft.

Client

Shapoorji Pallonji Group

Status

Completed

Location

Dubai, UAE

Overview

Al Maktoum International Airport had a scope of developing tender representations as per the employer’s requirements such as creating construction sequencing (4D Simulation) as per the program, Site Layout Simulation, Resource (crew movement) Simulation, Construction  vehicles  and  traffic Simulation, Crane Simulation,  Cast-In-Place Concrete Simulation, Pre-Cast  Concrete Simulation, Steel  Reinforcement Simulation, Formwork and Scaffolding Simulation.

Deliverables

  • 4D simulation
  • Construction Sequencing
  • Construction Scheduling
  • Logistic Simulation
  • Post Simulation Rendering

Build Better, Faster

Connect with us to Streamline your construction process, reduce costs, and improve project efficiency with our expert-driven BIM & VDC solutions. To ensure seamless coordination, minimizing errors and delays, we help you to optimize workflows and maximize project success.